Title: | Failure Analysis of a Bucket Elevator Shaft |
Authors: | Gurudath B. Kumawat K.K. Tejaswi V. Sondar P.R. Rakshan Kumar J.K. Hegde S.R. |
Issue Date: | 2021 |
Citation: | Journal of Failure Analysis and Prevention Vol. 21 , 2 , p. 563 - 569 |
Abstract: | Present work investigates the in-service break down of a bucket elevator in a chemical processing plant. The elevator was used for lifting bulk Di-Ammonium Phosphate and broke down due to premature failure of a shaft made of EN19 steel. The investigation comprises a detailed metallurgical failure analysis involving site visit, visual inspection, fractography, and metallography. The investigation reveals that, about 2 years prior to the failure, the shaft was tack-welded to the sprocket hub and a gib-head key near the keyway to avoid the frequent loosening of the key. The inspection during the site visit confirms that the shaft-sprocket assembly was subjected to in-service jerky loading condition along with uneven stress distribution due to misaligned counterweight. The investigation concludes that a crack was initiated in the shaft at the heat affected zone of the tack-welded spot, propagated transversely by fatigue due to in-service cyclic loading, and terminated catastrophically by a brittle fracture during the service. Tack welding, coupled with uneven stress distribution in the shaft due to misaligned counterweight system, is adjudged the root cause of this failure. Suitable remedial measures are suggested to avoid such a failure in the future. © 2021, ASM International. |
URI: | https://doi.org/10.1007/s11668-020-01101-7 http://idr.nitk.ac.in/jspui/handle/123456789/16258 |
Appears in Collections: | 1. Journal Articles |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.