Please use this identifier to cite or link to this item: https://idr.l2.nitk.ac.in/jspui/handle/123456789/15363
Title: Effect of disturbed river sediment supply on shoreline configuration: A case study
Authors: Yadav A.
Dodamani B.M.
Dwarakish G.S.
Issue Date: 2021
Citation: ISH Journal of Hydraulic Engineering Vol. , , p. -
Abstract: The magnitude of river sediment supply and its distribution play a significant role in coastal sediment dynamics, especially in erosion and deposition. Due to the construction of the dam, obstruction in the natural flow of water occurs, and part of the sediment is trapped. In the present study, the Kali river catchment and its river-mouth at Karwar, Devbagh, and Ravindranath Tagore beaches are considered as the study area, to assess the impact of dams on coastal processes. Landsat data for 42 years, from 1975 to 2017, were collected and analyzed using DSAS, an ArcGIS extension. The sediment yield estimated at the Kali river basin outlet, without the dam is 4.19 t/ha/yr and with the dam, it is estimated to be 1.42 t/ha/yr. Similarly, for the Aghanashini river basin outlet, the sediment yield was found to be 4.58 t/hr/yr. From the results of shoreline analysis, it is found that after the construction of the dam, Devbagh beach is under erosion at the rate of −0.93 m/yr End Point Rate (EPR) and −0.47 m/yr Linear Regression Rate (LRR). Ravindranath Tagore beach also has undergone erosion, which is −0.75 m/yr (EPR) and −0.97 m/yr (LRR). Further, both the beaches have been changed to the erosion zone. © 2021 Indian Society for Hydraulics.
URI: https://doi.org/10.1080/09715010.2021.1878068
http://idr.nitk.ac.in/jspui/handle/123456789/15363
Appears in Collections:1. Journal Articles

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.